Future Water Security (FWS) is split into two phases:
Phase I - Drill one or two test holes to find adequate water.
Phase II - If adequate water if found in Phase I, convert the test hole into a production well.
NOTICE: At the April 20, 2026 board meeting, the following briefing will be presented:
The official report received from Dr. Brian Smith, geologist, was received on March 27, 2026. Click below for report:
Suggested Well Locations at Double Horn
Met with Dr. Brian Smith, Principal Hydrogeologist with Caves & Karst, LLC, on Monday, April 6, 2026 to walk several lots. Those in attendance were: Dr. Brian Smith, Steve Danjou, Roger Trejo, Svein Utskot, Curtis Raetz, and Mike Chiodo.
Phase I schedule included here: